Built-in GIS layers covering grid infrastructure, planning constraints, cadastral data, and regulatory zones — ready from day one, in every market.
The questions change as a project matures. The data you need to answer them is already in Glint Solar.
Before anything else, you need to know if the site makes basic economic sense. How close is the grid? Which substations serve this area? Does the parcel size and land type work? These layers answer those questions directly from the map — no external tool needed.
A site that looks viable on the surface can have layers underneath that kill the project. Flood risk, protected habitats, slope thresholds — these are the constraints that surface late and cost the most. Seeing them at the screening stage changes what you take forward.
By the time you're applying for consent, the authority's questions are already framed. Having the relevant regulatory layers mapped against your site — landscape designations, disadvantaged area status, network zones — means you're answering them before they're asked.
These are the outcomes developers achieve when site decisions are driven by data, not instinct. We've put the full picture into a brief designed for the conversations that happen inside your organisation.
A short, structured document you can share with leadership to make the case for data-led development. Written to inform a business decision, not to sell software.